B02 Ballarat Gov Hub
The $100 million GovHub project consists of a 5 storey office post and beam building with a brick masonry base. Construction is set to be completed in 2020.
View this Case StudyB04 Northumberland
A ground-breaking project which sets a new standard in community contribution for a commercial office development.
View this Case StudyFreshwater Dining Table
This table responds to an existing curved building façade. The table top is finished to a narrow profile and appears to float freely from three legs. The classic components of traditional timber-turning verge on decorative but are simplified by their precise lines and repetition.
View this Case StudyMelbourne School of Design
Laminated veneered lumber (LVL) and advanced prefabrication techniques used to construct a new education facility, the Melbourne School of Design, at The University of Melbourne.
View this Case StudyPhoenix Central Park
A gallery and performance space contrasts stark concrete walls with contoured CLT ribs and warm timber finishes.
View this Case Study