25 King St
25 King is a massive achievement in engineered timber, coming in as Australia’s tallest engineered timber office building, at 14,965sqm
View this Case StudyA02 Gillies Hall, Monash University
Australia's first mid-rise, mass timber, passive house student accommodation building.
View this Case StudyA03 276 Flinders Street
Multiplex has completed Fivex’s $24 million second mixed use facility, as a vertical extension of an existing building.
View this Case StudyA04 Aveo Bella Vista
The short delivery time requirement for the Aveo Bella Vista building, completed in Norwest, Sydney in 2018 made it an ideal project for a CLT design, enabling Strongbuild to complete it 13 weeks earlier than with the concrete program.
View this Case StudyA05 Olea
The Olèa apartments developed by Gibson Property Corporation and Roche Property Holdings are being completed by Figurehead (builder) with stud frames and floor cassettes supplied by Timbertruss. Adjoined by vast reserves and parklands, these apartments are nestled in a safe and lush botanic community combining the best of all amenities and effortless connectivity, in one of Victoria’s fastest growing suburbs.
View this Case StudyA06 Our Lady of Assumption Extension
The Our Lady of the Assumption School in North Strathfield utilises an existing three-storey concrete frame base built over 30 years ago. The extension includes 4 levels of CLT and glulam post and beam structure.
View this Case Study