The $100 million GovHub project consists of a 5 storey office post and beam building with a brick masonry base. Construction is set to be completed in 2020.
This table responds to an existing curved building façade. The table top is finished to a narrow profile and appears to float freely from three legs. The classic components of traditional timber-turning verge on decorative but are simplified by their precise lines and repetition.
Laminated veneered lumber (LVL) and advanced prefabrication techniques used to construct a new education facility, the Melbourne School of Design, at The University of Melbourne.