Aecom

Projects on Woodsolutions

a building with trees and a street

B02 Ballarat Gov Hub

The $100 million GovHub project consists of a 5 storey office post and beam building with a brick masonry base. Construction is set to be completed in 2020.
a building with many windows

B12 36 Wellington Street

Hines’ first initiative in Melbourne, this development represents an exciting sign of the times for timber construction. With two massive timber offices already built in the US and several more slated to start in the coming years, the Hines T3 strategy (Timber, Transit and Technology) replaces structural systems such as concrete and steel with prefabricated solid wood systems, to create best-in-class projects in a fast, clean, sustainable and aesthetically pleasing manner.
a house with a tree in the background

CLT House – Australia's First

The creative integration of various forms of timber is used to achieve a sustainable, architectural build with a modern industrial theme. From the 90 year old bridge beam forming the backbone of the house through to the use of CLT and recycled timber throughout, this home is the future of construction in Australia.
a stone structure with a large stone wall and a building

Lindisfarne Castle ticket hut

This timber-built ticket hut and assembly point for visitors entering the National Trust property on Holy Island adds a new dimension to a 16th century experience.
a building with a wood paneled wall

Gösta Serlachius Museum

With the complete employment of wood for its structure, exterior skin and interior fittings, this small town museum literally pushes wood to its full potential.

Are you looking for a supplier?

Start Your Search

Social Media Feeds