Image
Exposed timber post and beam structures leverage the benefits of biophilic design and wellbeing. From a design point of view there are a number of challenges that need to overcome. Nanyong Technological University Academic South Building is Asia’s last post, beam and CLT project. The 40,000 sq m project will cost $180 million and be completed in 2021. In part 2 of this 2 part series we’re speaking with Gary Caulfield, the project director and David Kingham, the project engineer about:
Logistics of the project and dealing with COVID-19, using an international supply chain
The cost curves of mass timber as a material selection going forward
Managing moisture during construction
Timber Talks Series 3
Presented by Adam Jones, an Australian engineer working in the industry, Timber Talks, gives you an informative and inspiring insight into the best design practices, latest innovations and interesting case studies from the world leading experts in timber design, specification and construction.
Subscribe to this series