Image
As we're continuing to innovate and build taller timber buildings, the installation process is sometimes an afterthought. With good planning, the installation can be de-risked and improve the overall program. In this episode, we're speaking with Lincoln Ladds who is an Associate Engineer at TTW about:
- The challenges around mixing materials on a project
- The temporary works design considerations
- And major lessons learned in construction engineering for the projects he's been part of
Timber Talks Series 5
Presented by Adam Jones, an Australian engineer working in the industry, Timber Talks, gives you an informative and inspiring insight into the best design practices, latest innovations and interesting case studies from the world leading experts in timber design, specification and construction.