B06 752 High Street
Construction commenced in 2019 and is expected to be completed in 15 months (September 2020), with the 5 floors of CLT erected in October 2019. The architect and his client are excited to be part of a natural and sustainable way of building that contributes to higher density residential development with a passive solar design and shared rooftop deck that will encourage a sense of community.