A mezzanine floor utilising CLT panels instead of conventional cast-in-situ concrete saving the contractor time while offering a sustainable building solution and a beautiful finish for the client.
This unique project for a Hawthorn primary school is the first of its kind for Australia. The fabrication and installation of a structural timber floor system stretching seventeen metres across created a multipurpose room filled with appealing organic textures.